Laserfiche WebLink
Unit Cost Subtotal Cost <br /> Area of Work Unit M Quantity M <br /> 26. 12-inch diameter HDPE Piping and Fittings(Leachate Pond)and LF 217 <br /> Supports <br /> 27. PCC Trapezoidal Channel and Transition Structure SF 12,642 <br /> 28. Channel Bridge Crossing(Detail 6/10) EA 1 <br /> 29. Desilting Basin and Desilting Basin Inlet and Outlet Works LS 1 <br /> 30. Provide Earth Fill at Desilting Basin and Leachate Pond CY 15,000 <br /> 31. Crushed Miscellaneous Base with 8 oz geotextile underlayment SF 87,660 <br /> 32. Earthen Channel LF 520 <br /> 33. Triangular Access Road Berm LF 1,910 <br /> Total Construction Cost <br /> Note: Furnish (material or equipment) is defined as: to supply and deliver to the Project ready for installation <br /> and in acceptable operable condition. Install (services or labor) is defined as: to place in final position, <br /> complete, anchored, connected, and in acceptable operable condition. Provide is defined as: to furnish and <br /> install complete. When neither furnish,install,nor provide is stated,provide is implied. <br /> II - 2 <br />