My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 UNIT PRICE LIST -The following unit price list should represent all components of the work, <br /> and will be utilized as the basis for determining compensation for change orders, delays or unspecified <br /> extra work items that may arise during the work. The cost indicated for each item will be the total cost <br /> of the compensation, and will include labor, supervision, overheads, profit, and any other costs. <br /> Standby will be incurred by OWNER only if the CONTRACTOR is unable to work a forty (40) hour <br /> week because of OWNER caused delays. OWNER will not pay standby time because of inclement <br /> weather. Rates for the work performed will be as identified in the Contract. Standby rates cover <br /> ownership costs only; costs for profit, labor, and maintenance have been deducted. Standby for rental <br /> equipment will be presented by CONTRACTOR for review and approval by OWNER; only those <br /> items identified as rental equipment in the original bid or subsequently approved for Project use in <br /> writing by OWNER will be considered. CONTRACTOR to provide formula to calculate standby costs <br /> from unit costs to apply for equipment not shown. <br /> Stand-by <br /> Number Unit Cost Rate <br /> Required Equipment and Model ($ /hour) ($/hour) <br /> Labor(by Category) <br /> Field Superintendent <br /> Equipment operator <br /> Note: List all of the equipment required for the execution of this job. <br /> II - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.