Laserfiche WebLink
SPECIAL PROVISIONS FOR CONSTRUCTION <br /> WMU FU-03 LINER, DESILTING BASIN, AND <br /> WMU F-WEST LEACHATE IMPOUNDMENT, <br /> CONSTRUCTION PROJECT <br /> TABLE OF CONTENTS <br /> SECTION 1 GENERAL TERMS AND CONDITIONS <br /> SECTION 2 TECHNICAL SPECIFICATIONS <br /> Section 01100 Summary <br /> Section 01200 Meaurement and Payment <br /> Section 01310 Health and Safety <br /> Section 01323 Progress Schedules <br /> Section 01330 Submittal Procedures <br /> Section 01400 Quality Requirements <br /> Section 01410 Surveys <br /> Section 01500 Temporary Facilities and Controls <br /> Section 01700 Contract Close Out <br /> Section 07100 Mobilization and Demobilization <br /> Section 02300 Earth Work <br /> Section 02535 Leachate Pipe <br /> Section 02645 Miscellaneous Civil Improvements <br /> Section 02771 Geotextiles <br /> Section 02774 Geocomposite Drainage Net <br /> Section 02777 Geosynthetic Clay Liner <br /> Section 02778 HDPE Geomembrane <br /> APPENDICES <br /> Appendix A Construction Quality Assurance Plan <br /> FORWARD LANDFILL i WMU FU-03 <br />