Laserfiche WebLink
WMU FU-03 COMPOSITE LINER, DESILTING BASIN, <br /> AND WMU F-WEST LEACHATE IMPOUNDMENT <br /> CONSTRUCTION PROJECT <br /> SECTION 1 <br /> GENERAL TERMS AND CONDITIONS <br /> 1.1 INTRODUCTION <br /> The project is located at the Forward Landfill. The Contractor shall become thoroughly familiar <br /> with the Health and Safety Provisions in Section 01310 of these Specifications for precautionary <br /> measures to be followed during construction. <br /> Definition of Terms <br /> Owner:..........................................Allied Waste Inc., <br /> Engineer:......................................For this project Engineering/Design support will be performed <br /> by Bryan A. Stirrat & Associates, Inc., 1360 Valley Vista <br /> Drive, Diamond Bar, CA 91765, telephone (909) 860-7777 or <br /> Lewis Engineering, 98 Ramona, Piedmont, CA (510) 601- <br /> 7223. <br /> Contractor: ...................................The person, persons, firm, partnership, corporation or <br /> combination thereof, who have entered into a contract with <br /> Allied Waste to perform work pursuant to the Contract <br /> requirements. <br /> Construction Quality Assurance <br /> (CQA) Firm:.................................The firm under contract to perform Construction Quality <br /> Assurance monitoring and reporting for the project. <br /> These Special Provisions include the General Terms and Conditions and the Technical <br /> Specifications for the WMU FU-03 Liner, Desilting Basin, and WMU F-WEST Leachate <br /> Impoundment, Construction Project at the Forward Landfill. <br /> 1.2 DESCRIPTION OF WORK <br /> The work to be done by the Contractor shall include furnishing all labor, materials, tools, <br /> equipment, power, and water for the construction of the WMU FU-03 Composite Liner Project, <br /> desilting basin, and WMU F-West leachate impoundment and all associated work represented on <br /> the Contract Drawings, and included in these Special Provisions. <br /> The major features of the work to be performed shall include but not be limited to: <br /> • Miscellaneous grading,unclassified excavation, and unclassified fill. <br /> FORWARD LANDFILL SC-1 WMU FU-03 <br />