Laserfiche WebLink
1.11 Construction Water <br /> Construction water is available on site. The Contractor shall contact the Landfill Operations <br /> p ons <br /> Manager for location, metering requirements, volume requirements for landfill operations, and <br /> availability for contractor's use. <br /> The Contractor may develop sources of water supply or obtain water from private sources. <br /> Payment for all cost connected with developing a water source or obtaining water shall be made <br /> by the Contractor. Water shall be clean and free from objectionable amounts of acids, alkalis, <br /> salts or organic materials. The Contractor may be required to furnish the Engineer with a water <br /> analysis performed by a laboratory acceptable to the Engineer. The Contractor shall pay all costs <br /> of sampling, testing and reporting the test results. <br /> 2.0 PRODUCTS (Not Used) <br /> 3.0 EXECUTION (Not Used) <br /> 4.0 MEASUREMENT AND PAYMENT <br /> (Refer to Section 01200, PRICE AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> FORWARD LANDFILL WMU FU-03 <br /> SC-5 <br />