My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Topographic Maps: Existing topographic information shown on Construction <br /> Drawings is from a 2002 aerial survey. The existing ground surface has been <br /> modified in some locations subsequent to the date of the aerial survey. <br /> C. Where measurement of quantities depends on elevation of existing ground <br /> elevations obtained during construction, including preconstruction surveys, will <br /> be compared with those shown on Construction Drawings. If variations between <br /> preconstruction surveys and the 2002 topographic mapping are 1-foot or less, the <br /> 2002 topographic information will be used for determining quantities. <br /> D. Measurement for payment for furnishing and installing unit price items shall be <br /> made by the unit listed on the Bid Form. Quantity shall be calculated on the basis <br /> of dimensions shown on the Construction Drawings. Dimensions listed on the <br /> Construction Drawings, as a minimum requirement, represent the minimum <br /> required for payment. No allowance will be made for items placed outside or in <br /> excess of said dimensions, including material placed or removed for Work <br /> performed due to survey accuracy and tolerances, equipment accuracy and/or <br /> necessary over building, unless otherwise approved in writing by the OWNER. <br /> Where volumes for payment are calculated by Drawing dimensions or surveys of <br /> actual area covered multiplied by thickness, the thickness used in the calculation <br /> shall be the minimum thickness shown on the Construction Drawings. <br /> 1.6 PAYMENT <br /> A. Ten percent of the Contract Price will be withheld until final completion of the <br /> Work. <br /> B. Payment for the items specified on the Bid Form shall be by their unit prices <br /> quoted. <br /> C. Payment for unit price items covers all Work necessary to furnish and install the <br /> items and shall include full compensation for providing all labor, materials, <br /> equipment, tools, accessories, submittals, and incidentals, and for performing all <br /> Work specified including, but not limited to, installing, seaming testing, repairing, <br /> protection, and all QA/QC documentation required to complete the Work in <br /> accordance with these Specifications and Construction Drawings and as directed <br /> by the QA/QC CONSULTANT, DESIGN ENGINEER, or OWNER. <br /> D. Separate payment will not be made for items not listed on the Bid Form but are <br /> necessary to complete the Work. Such items will be considered incidental to the <br /> Bid Items listed on the Bid Form. <br /> 1.7 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS <br /> A. Payment will not be made for the following: <br /> 1. Loading, hauling, disposing or replacement of rejected, contaminated or <br /> damaged material or material which does not meet product Specifications <br /> listed in the Contract Documents. <br /> 2. Quantities of material wasted or disposed of in manner not called for under <br /> Contract Documents. <br /> 3. Rejected loads of material, including material rejected after it has been placed <br /> by reason of failure of CONTRACTOR to conform to provisions of Contract <br /> Documents. <br /> FORWARD LANDFILL 01200 <br /> 2 PRICE AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.