My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01330 <br /> SUBMITTAL PROCEDURES <br /> PART 1 GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Requirements and procedures for preparation and submission of submittals. <br /> B. Requirements for preparation of progress schedules. <br /> 1.2 RELATED WORK SPECIFIED UNDER OTHER SECTIONS <br /> A. Individual Specification sections in these Contract Documents contain additional <br /> and special submittal requirements. Individual sections shall take precedence in <br /> the event of a conflict with this section. <br /> 1.3 GENERAL <br /> A. OWNER reserves the right to modify the procedures and requirements for <br /> submittals, as necessary to accomplish the specific purpose of each submittal. <br /> Direct inquiries to the DESIGN ENGINEER or QA/QC CONSULTANT <br /> regarding the procedure, purpose, or extent of any submittal. <br /> B. Review, acceptance, or approval of substitutions, schedules, shop drawings, lists <br /> of materials, and procedures submitted or requested by the CONTRACTOR shall <br /> not add to the Contract price, and resulting additional costs shall be solely the <br /> obligation of the CONTRACTOR. <br /> C. OWNER is not precluded, by virtue of review, acceptance, or approval, from <br /> obtaining a credit for construction savings resulting from allowed concessions in <br /> the Work or materials. <br /> D. OWNER is not responsible to provide engineering or other services to protect the <br /> CONTRACTOR from additional costs accruing from submittals. <br /> E. Submittals processed by the DESIGN ENGINEER or QA/QC CONSULTANT do <br /> not become Contract Documents and are not Change Orders. The purpose of <br /> submittal review is to establish a reporting procedure and is intended for the <br /> CONTRACTOR's convenience in organizing the Work and to permit the <br /> DESIGN ENGINEER or QA/QC CONSULTANT to monitor the <br /> CONTRACTOR's progress and understanding of the design. <br /> F. Delays caused by the need for resubmittal shall not constitute basis for claim. <br /> G. After checking and verifying all field measurements, make submittals to DESIGN <br /> ENGINEER or QA/QC CONSULTANT, in accordance with the schedule of <br /> submittals for review. <br /> 1. Submittals shall bear a stamp or specific written indication that the <br /> CONTRACTOR has satisfied its responsibilities under the Contract <br /> Documents with respect to the review of the submittal. <br /> FORWARD LANDFILL 01330 <br /> 1 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.