My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The product or system has been inspected by a manufacturer's authorized <br /> representative. <br /> B. Certification of Compliance: <br /> 1. Where specified, furnish certification of compliance for products specified <br /> to a recognized standard or code prior to the use of such products in the <br /> Work. <br /> a. The DESIGN ENGINEER may permit use of certain materials or <br /> assemblies prior to sampling and testing if accompanied by a <br /> certification of compliance. <br /> b. Certifications shall be signed by the manufacturer of the product; state <br /> that the components involved comply in all respects with the <br /> requirements of the Specifications. <br /> C. Furnish certification of compliance with each lot delivered to the <br /> jobsite and clearly identify the lot so certified. <br /> 2. Products used on the basis of a certification of compliance may be sampled <br /> and tested at any time. The fact that a product is used on the basis of a <br /> certification of compliance shall not relieve CONTRACTOR of <br /> responsibility for incorporating products in the Work which conforms to <br /> requirements of the Contract Documents. Products not conforming to such <br /> requirements will be subject to rejection whether in-place or not. <br /> 3. The DESIGN ENGINEER reserves the right to refuse permission for use of <br /> products on the basis of a certification of compliance. <br /> 1.9 CONTRACT CLOSEOUT SUBMITTALS <br /> A. Record Drawings: <br /> 1. The QA/QC CONSULTANT will prepare a set of record drawings for the <br /> project which will include the changes made in materials, equipment, <br /> locations, and dimensions of the Work. The OWNER and <br /> GEOSYNTHETICS CONTRACTOR shall provide as-built survey <br /> information in a format acceptable to the QA/QC CONSULTANT to <br /> incorporate in the record drawings. <br /> PART 2 PRODUCTS (Not Used) <br /> PART 3 EXECUTION (Not Used) <br /> PART 4 MEASUREMENT AND PAYMENT <br /> (refer to Section 01200, MEASUREMENT AND PAYMENT PROCEDURES) <br /> END OF SECTION <br /> FORWARD LANDFILL 01330 <br /> 5 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.