My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 SUBMITTALS <br /> A. The OWNER will submit the preconstruction survey to the EARTHWORK <br /> CONTRACTOR and QA/QC CONSULTANT at least two days before the <br /> scheduled start date of the Work. The preconstruction survey will be depicted on <br /> the Construction Drawings grading plan in a screened font. <br /> B. The OWNER will prepare as-built survey drawings for WMU FU-03 liner <br /> construction for the top of clay liner, top of granular drainage material, and top of <br /> protective operations layer. The as-built drawings will be prepared at a 1:50 scale <br /> and will depict the prominent layer with the preceeding layer in a screened font. <br /> Grid points and elevations of both the prominent and preceeding layer will be <br /> shown. A table listing northings, eastings, and elevations of the coordinate points <br /> will also be included on the drawing. <br /> C. The results of the WMU FU-03 top of clay liner, top of granular drainage layer, <br /> and top of protective operations layer surveys will be provided to the QA/QC <br /> CONSULTANT within two days of the survey for approval prior to placing <br /> overlying materials. The QA/QC CONSULTANT shall have two working days to <br /> review survey results and may independently verify survey results. The time <br /> taken by the OWNER to perform the survey and by the QA/QC CONSULTANT <br /> in checking and verifying the survey results will be considered included in the <br /> total calendar days allotted the EARTHWORK CONTRACTOR before liquidated <br /> damages are assessed. <br /> 1.4 PRECONSTRUCTION SURVEY <br /> A. The OWNER will perform a preconstruction survey in all areas identified by the <br /> DESIGN ENGINEER as having been modified from the topography depicted on <br /> the Construction Drawings. <br /> B. The preconstruction survey will be performed at a minimum 100-ft grid, delineate <br /> all break points and significant features, and be of sufficient detail to create a <br /> topographic map suitable for volume calculation purposes. <br /> 1.5 SURVEYS FOR LAYOUT AND PERFORMANCE OF WORK <br /> A. The EARTHWORK CONTRACTOR shall perform all surveys for layout and <br /> performance of the Work, reduce the field notes, and make necessary calculations <br /> for performance of the Work. <br /> 1.6 AS-BUILT SURVEY DRAWINGS—WMU FU-03 <br /> A. The OWNER will establish a 75-foot reference grid for verifying minimum slope <br /> grades and for thickness determinations of overlying layers of the lining and LCRS <br /> systems. Survey measurements shall be taken at the same reference grid points for <br /> each succeeding layer. <br /> B. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 working <br /> days in advance of when a layer is completed and ready for as-built surveys. The <br /> OWNER will perform the as-built survey within two days of the layer being <br /> completed. The results of the top of clay liner, top of granular drainage layer, and <br /> top of protective operations layer surveys will be provided to the QA/QC <br /> CONSULTANT within two days of the survey for approval prior to placing <br /> overlying materials. The QA/QC CONSULTANT shall have two working days to <br /> FORWARD LANDFILL 01410 <br /> 2 SURVEYS <br />
The URL can be used to link to this page
Your browser does not support the video tag.