to review survey results and may independently verify survey results. The <br /> time taken by the CQA Team in checking and verifying the survey results <br /> will be considered included in the total calendar days allotted the <br /> EARTHWORK CONTRACTOR before liquidated damages are assessed. <br /> The results of the survey shall be provided to the QA/QC CONSULTANT <br /> for approval prior to placing the overlying materials. <br /> 3. A leak location test will be performed on the geomembrane before and after <br /> placement of the granular drainage material and protective operations layer. <br /> The GEOSYNTHETICS CONTRACTOR shall be responsible for repairing <br /> all identified leaks in the geomembrane prior to placement of the overlying <br /> earthwork and geosynthetic materials. The EARTHWORK <br /> CONTRACTOR shall be responsible for repairing all identified leaks in the <br /> geomembrane following placement of the overlying earthwork and <br /> geosynthetic materials. The EARTHWORK CONTRACTOR shall remove <br /> all earthwork and geosynthetic materials overlying the geomembrane to the <br /> extent required to repair the leak and shall repair all identified leaks in the <br /> geomembrane at his sole expense. Following the repair of the leak in the <br /> geomembrane, the EARTHWORK CONTRACTOR shall replace all <br /> earthwork and geosynthetic materials at his sole expense. All Work <br /> performed to repair and replace materials shall be performed in accordance <br /> with the applicable Specifications sections. <br /> B. Granular Drainage Material Placement: <br /> 1. The geomembrane lining underlying the GDM layer shall be inspected and <br /> approved by the QA/QC CONSULTANT prior to placement of the GDM. <br /> 2. GDM shall be placed in a single continuous and approximately horizontal <br /> lift unless otherwise specified or specifically permitted by the QA/QC <br /> CONSULTANT. <br /> 3. Method of dumping and spreading materials shall ensure uniform <br /> distribution of the material and prevent damage to the underlying <br /> geomembrane lining. <br /> 4. Layer thickness shall be as shown on the Construction Drawings. Do not <br /> operate placement equipment over the geomembrane lining with less than <br /> 12 inches of granular drainage materials in place. <br /> 5. Equipment used and placement method shall be approved by the QA/QC <br /> CONSULTANT prior to the start of Work. Approval does not absolve the <br /> EARTHWORK CONTRACTOR of responsibilities for damage to the <br /> underlying geomembrane lining, at the EARTHWORK CONTRACTOR's <br /> sole expense. <br /> 6. EARTHWORK CONTRACTOR is responsible for repairing any <br /> geomembrane lining material damaged during GDM placement at no cost to <br /> the OWNER. <br /> FORWARD LANDFILL 02300 <br /> 19 EARTHWORK <br />