My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. Operations layer soil overlying the liner system components shall immediately <br /> follow the installation of the geomembrane and other geosynthetics overlying the <br /> geosynthetic clay liner. If areas cannot be covered immediately due to steepness of <br /> slopes, visqueen shall be placed over geosynthetic components overlying the <br /> geosynthetic clay liner. The geosynthetic clay liner shall be removed and replaced if <br /> it becomes hydrated. <br /> M. All hydrated geosynthetic clay liner shall be removed and replaced by the <br /> GEOSYNTHETICS CONTRACTOR at no additional cost to the OWNER. <br /> Hydrated GCL is defined as material that has become soft as determined by <br /> squeezing the material with finger pressure, material that has exhibited swelling, or <br /> material that has a moisture content greater than 100 percent as determined by <br /> ASTM D2216 or ASTM D4643. Cause for replacement of the GCL due to <br /> exposure to moisture and subsequent hydration shall be determined at the QA/QC <br /> CONSULTANT's sole discretion. <br /> 3.6 SEAMS AND OVERLAPS <br /> A. On slopes steeper than 10:1 (horizontal to vertical) all geosynthetic clay liners shall <br /> be continuous down the slope; that is, no horizontal seams shall be allowed on the <br /> slope. <br /> B. No horizontal seams shall be allowed on the base and the crest of the landfill within <br /> 5 feet(1.5 m) of the toe or the crest of the slope. <br /> C. All geosynthetic clay liners shall be overlapped in accordance with the <br /> Manufacturer's recommended procedures. As a minimum, along the length (i.e., the <br /> sides) of the mat, the overlap shall be 12 inches. Along the width (i.e., the ends) of <br /> the mat,the overlap shall be 12 inches. <br /> D. The overlaps shall not be nailed or stapled to the subgrade. <br /> E. Granular bentonite shall be placed on the overlaps. <br /> 3.7 MATERIALS IN CONTACT WITH THE GEOSYNTHETIC CLAY LINER <br /> A. Installation on rough surfaces shall be carefully perfonned to minimize damage to <br /> the geosynthetic clay liner. <br /> B. Equipment used for placing soils shall not be driven directly on the geosynthetics <br /> overlying the geosynthetic clay liner. A minimum thickness of 1 foot of material <br /> is required between a low ground pressure dozer (such as a wide pad <br /> Caterpillar D-4 bulldozer or equivalent) and the geosynthetic clay liner. A <br /> minimum thickness of 3 feet of material is required between rubber-tired vehicles <br /> and the geosynthetic clay liner. In areas of heavy vehicle traffic, such as access <br /> ramps, the material thickness should be at least 3 feet. The following table shall <br /> be complied with during construction: <br /> FORWARD LANDFILL 8 02777 <br /> GEOSYNTHETIC CLAY LINER(GCL) <br />
The URL can be used to link to this page
Your browser does not support the video tag.