Laserfiche WebLink
'Malum � <br /> > merit G <br /> Euround Pressure I�utZa L><ft Th lckness <br /> � .p <br /> 5 1.0 <br /> 10 1.5 <br /> 20 2.0 <br /> >20 >3.0 <br /> C. Installation of the geosynthetic clay liner areas with appurtenances areas, and <br /> connection of the geosynthetic clay liner to appurtenances shall be made according <br /> to the Construction Drawings. The GEOSYNTHETICS CONTRACTOR shall <br /> ensure that the geosynthetic clay liner is not damaged while working around the <br /> appurtenances. <br /> 3.8 REPAIR <br /> A. Any holes or tears in the geosynthetic clay liner shall be repaired by placing a <br /> geosynthetic clay liner patch over the hole. On slopes greater than 5 percent, the <br /> patch shall overlap the edges of the hole or tear by a minimum of 24 inches (0.6 m) <br /> in all directions. On slopes 5 percent or flatter, the patch shall overlap the edges of <br /> the hole or tear by a minimum of 12 inches(0.3 m)in all directions. The patch shall <br /> be secured with a water-based adhesive, if approved by the Manufacturer and by the <br /> QA/QC CONSULTANT. <br /> B. Care shall be taken to remove any soil or other material that may have penetrated the <br /> torn geosynthetic clay liner. <br /> C. All repairs shall be made at no additional cost to the OWNER. <br /> D. The patch shall not be nailed or stapled. <br /> 3.9 PRODUCT PROTECTION <br /> A. The GEOSYNTHETICS CONTRACTOR shall use all means necessary to protect <br /> all prior work and materials and completed work of other Sections. <br /> B. In the event of damage, the GEOSYNTHETICS CONTRACTOR shall immediately <br /> make all repairs and replacements necessary, to the approval of the QA/QC <br /> CONSULTANT and at no additional cost to the OWNER. <br /> 3.10 ACCEPTANCE <br /> A. GEOSYNTHETICS CONTRACTOR shall retain ownership and responsibility <br /> for GCL until accepted by OWNER. <br /> B. OWNER will accept GCL when all of the following conditions are met: <br /> 1. The installation is complete. <br /> 2. Required documentation is complete. <br /> FORWARD LANDFILL 9 02777 <br /> GEOSYNTHETIC CLAY LINER(GCL) <br />