Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. -3- <br /> DISCHARGE OF TREATED GROUNDWATER <br /> FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 3. Point of Compliance <br /> The point of compliance is the effluent monitoring port. <br /> 4. Compliance Period. <br /> The compliance period is any period during which the treatment plant is operating and <br /> discharging treated water. <br /> If the Discharger finds that the concentration of one or more Constituents of Concern have <br /> exceeded the approved Concentration Limit(s), the Discharger shall cease discharge and perform <br /> whatever repairs and/or maintenance to the treatment system that may necessary to prevent <br /> further releases. <br /> REPORTING <br /> The Discharger shall report field and laboratory test results in quarterly monitoring reports. The <br /> Discharger shall submit the quarterly monitoring reports to the Board by 301h of the month after the end <br /> of the quarter, ie. lst Quarter by 30 April, 2°d Quarter by 30 July, 3rd Quarter by 30 October and 4th <br /> Quarter by 30 January. The Discharger shall arrange the data in tabular form so that the date, the <br /> constituents, the concentrations, and the units are readily discernible. A discussion of the monitoring <br /> results shall precede the tabular summaries. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> reports shall be prepared by a registered professional engineer or geologist (or their subordinate) and <br /> signed by the registered professional. <br /> Each quarterly report is to include the following information: <br /> (a) a discussion of the monitoring results and compliance with this MRP and the WDRs; <br /> (b) tabulated cumulative monitoring wastewater analytical data, and monthly average wastewater <br /> discharge rate in gallons per day; and <br /> (c) a copy of the laboratory analytical reports and chain of custody. <br /> The results of any monitoring done more frequently than required at the locations specified in the MRP <br /> shall also be reported to the Board. <br />