Laserfiche WebLink
A. " ward information Page 1 of 2 <br /> Michael Kith [EH] <br /> From: Robert McClellon [EH] <br /> Sent: Friday, November 18, 2005 2:21 PM <br /> To: Michael Kith [EH] <br /> Subject: FW: Forward information <br /> -----Original Message----- <br /> From: Kennedy, Keith [mailto:KKennedy@CIWMB.ca.gov] <br /> Sent: Friday, November 18, 2005 1:50 PM <br /> To: Robert McClellon [EH] <br /> Subject: FW: Forward information <br /> From: De Bie,Mark <br /> Sent: Friday,November 18,2005 1:44 PM <br /> To: Kennedy,Keith <br /> Subject: RE: Forward information <br /> It a two parter, one is what the Statue allows and one is what the LEA chooses to put in the N&O. In this case they are the <br /> same. <br /> PS. Should not this N&O be very clear that the operator must cease accepting all materials in access of the tonnage limit, <br /> or define what they mean by waste. This is the time to be very clear what the current expectations are. If they want some <br /> flexibility to address shifts in what counts or what does not count they could include a clause that allows materials not to <br /> count after LEA approval. <br /> From: Kennedy, Keith <br /> Sent: Friday, November 18, 2005 1:24 PM <br /> To: De Bie, Mark <br /> Subject: RE: Forward information <br /> Mark, this is a draft copy of the N&O the LEA is writing: <br /> THERFORE PURSUANT TO PUBLIC RESOURCES CODE DIVISION 30 AND CALIFORNIA <br /> CODE OF REGULATIONS, TITLE 27, DIVISION 7,YOU ARE HEREBY ORDERED TO: <br /> 1. Immediately discontinue receiving waste in excess of the permitted maximum tonnage of 46,080 tons <br /> per week not exceeding 8,668 tons per day until your Solid Waste Facility Permit(SWFP) is revised to <br /> reflect that increase. <br /> 2. Immediately comply with all terms and conditions of the SWFP until the SWFP is revised to reflect those <br /> changes. <br /> 3. Submit application, applicable fees and an amendment to RDSI to this LEA by December 17,2005. The <br /> amendment shall include, but not limited to, the proposed change in site life, waste to cover ratio and any <br /> applicable calculation(s); the justification of site need regarding the beneficial reuse and ADC; the projection of <br /> the amount of material needed for beneficial reuse, ADC and cover soil on an annual basis; and all information <br /> listed in 27CCR21600(b). <br /> 11/18/2005 <br />