Laserfiche WebLink
U <br />WMU FLI-03, WMU F -West Leachate Impoundment and Desilting Basin February 2004 <br />Forward Landfill Job No. 021605.03 <br />1.0 INTRODUCTION <br />This report summarizes the construction quality assurance (CQA) observations and <br />activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. (Forward), <br />during the construction of the WMU FU -03 composite liner system, the desilting basin, <br />and the WMU F -West Leachate Impoundment at the Forward Landfill. CQA activities <br />included monitoring earthworks construction, geosynthetics installation, and collection <br />piping installation. This final report contains detailed documentation that the <br />construction and CQA activities associated with WMU FU -03 composite liner system, <br />desilting basin, and WMU FU -03 Leachate Impoundment composite liner system were <br />constructed in accordance with approved clarifications and modifications thereto, as <br />well as in general accordance with the following documents: <br />• Title 27 of the California Code of Regulations; <br />• Special Conditions, WMU FU -03, Desilting Basin and WMU F -West Leachate <br />Impoundment Construction Project, Lewis Engineering and Bryan A. Stirrat <br />and Associates, August 2003; and <br />• Construction Quality Assurance Manual WMU FU -03, Forward Landfill, Lewis <br />Engineering and Bryan A. Stirrat and Associates, August 2003. <br />Vector performed work on this project under authorization from Forward's project <br />manager, Mr. Lochlin Caffey. This report was prepared for Allied by Mr. Ken Davila, <br />CQA Monitor and Mr. Bryan Fritzler, P.E., Company CQA Manager. Mr. Monte Christie, <br />P.E., project manager, of Vector provided peer review of this report. <br />Vector Engineering, Inc. - 143E Spring Hill Drive • Grass Valley, CA 95945 • (530) 272-2448 <br />-1- <br />