Laserfiche WebLink
V TV <br /> rjuCTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 53 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. November 6, 2003 Thursda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Construction Sukut GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Cold,overcast and Ken Davila <br /> CLAY breezy PM-rain <br /> Equipment on site: <br /> 1-16G blade, 1-backhoe, 1-633 Eal er <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After yesterday evening's call from the GSE superintendent that they would start earlier, I arrived on site <br /> at 5:50am to continue deployment observations and documentation of the secondary liner in the lechate <br /> pond. They deployed GCL and double textured 60 mil HDPE throughout the day. In the mid to late <br /> afternoon, it began to rain and the exposed GCL and native clay were covered with 6 mit plastic provided <br /> by Forward personnel. <br /> Sukut bladed and placed fill on the access road and also placed 6 mil plastic over the FU-03 cell floor. The* <br /> blade graded the access road and the scraper hauled stockpiled material to the access road. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />