My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MICTOR <br /> ENGINEENNG INC. <br /> A/LY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 58 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan (Forward, Inc.) November 12, Wednesday <br /> 2003 <br /> General Contractor. Liner Contractor: Project Engineer:- <br /> Sukut <br /> ngineer:Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: o«y: <br /> Tim Sues Awe Khoumn 9 Montie Christie and Lochlin Caffe <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cool,clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> 1-16G blade 1-633scraper,r 1-backhoe <br /> MOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for observations and documentation at the location listed above. GSE continued deployment <br /> of the primary 60 mil liner until reaching the sump area. The crew stopped deployment and began repairs <br /> and testing until the sump pipe and gravel could be placed by Sukut. Panels were deployed on the north <br /> slope working toward, and covering,the east slope. Eleven(11)panels were deployed and seamed <br /> throughout the morning and early afternoon. Five(5)destructive samples were marked at random locations <br /> and cut out by GSE. Testing of the samples will be performed tomorrow. <br /> Roll certifications for the GCL which arrived on site Monday were requested from GSE and the foreman <br /> stated that they would be delivered to him tomorrow. He also stated that deployment of the GCL on the 5:1 <br /> slope would begin tomorrow morning. I informed him that without the certifications and conformance <br /> testing results,the material would be placed at his own risk. <br /> Sukut worked on the access road with the blade and scraper as the backhoe backfilled the west slope <br /> anchor trench of the FU-03 cell. Laborers raked the subgrade of the north slope of the cell and the five to <br /> one(5:1) slope throughout the day. The pipe welder arrived on site and welding of the leachate pond sump <br /> pipe began. Caps for the leachate pond sump pipe were found,but the brace for the pipe at the anchor <br /> trench would still have to be ordered. <br /> Vector's co-project manager,Montie C.,was on site for the weekly meeting, site recon and to collect <br /> completed data sheets for final report preparation. The backhoe dug one pit to the depth of four(4)feet on <br /> the western 5:1 slope. This was performed in the presence of Montie to verify clay thickness. <br /> In the early afternoon,the weekly meeting was held by Lochlin C. (Allied)to discuss project progress and <br /> scheduling. <br /> Prepared By: Reviewed By: 10 <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.