Laserfiche WebLink
TZECTOR <br /> ENGINEERING INC. <br /> DA►LY <br /> CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 68 <br /> Location of Work: Client Or Manager bate: Day of The Week: <br /> Manteca,Ca Butch Stefan (Forward,Inc.) November 23, Sunday <br /> 2003 <br /> General Contractor: Liner Contractor: project Engineer; <br /> Sukut Construction GSE SanSeta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> Tim Sues Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cold,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-16G blade 1-water frac 1-633 scrar, 1-backhoe 1-smoothdrurn roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with Tim,the Sukut foreman,to view,walk and discuss the west FU-03 cell <br /> floor conditions. They continued work on the sump area and on the east and west"V"ditches. The smooth- <br /> drum rolled the west floor just prior to liner deployment. The blade graded the sump and surrounding area <br /> clay. <br /> GSE continued to deploy 60mil double textured HDPE. Five(5)panels were deployed, seamed and air <br /> tested on the west floor throughout the day. <br /> Destructive sample locations of the double textured 60 mil were marked for testing and will be cut out <br /> tomorrow. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />