17ECTOR <br /> ENGMEEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Idly Field Report Sequence Number: <br /> Forward Landfill 021605.03 69 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan (Forward, Inc.) November 24, Monday <br /> 2003 <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown silty Clay Cold,clear and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-16G blade 1-water fra.11-633 sera 1-backhoe 1-smoothdrum roller <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss the deployment schedule for today. They <br /> continued to deploy 60mil double textured HDPE. Six(6)new panels and sixteen(16)old were deployed, <br /> seamed and air tested on the west and central floor throughout the day. The old panels were rolls which had <br /> been placed but not completely unrolled. Destructive sample locations of the double textured 60 mil were <br /> received by GSE after cutting them out. <br /> Sukut continued work in the cell sump in preparation for the lysimeter placement tomorrow. Minor work <br /> was performed on the access road into the cell in preparation of tomorrow's road base placement. Eight <br /> ounce(8oz)geotextile was placed on the lower portion of the road into and contacting the cell. <br /> Quartaroli Surveying was on site to shoot the sump and the remainder of the southern end of the cell <br /> floor. Prior to him leaving the site, he stated that all areas had been recorded as acceptable and that liner <br /> deployment could proceed. The specified two(2)foot clay minimum had been met in all areas. <br /> The weekly meeting is scheduled for tomorrow at 4:00 PM. <br /> Testing on the lysimeter is scheduled for tomorrow afternoon to be performed by others. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-� <br />