Laserfiche WebLink
y TV <br /> v ju CTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 78 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefa.ni Forward, Inc. December 5,2003 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Awe Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cold,raining and Ken Davila <br /> wind <br /> Equipment on site: <br /> 1-16G blade 1;!k <br /> .ig loader, 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the GSE foreman to discuss today's work schedule. Geocomposite was <br /> deployed on the south slope of the FU-03 cell throughout the morning. Two(2)panel widths were left open <br /> near the sump riser pipe for construction access. Rain halted further work and the foreman stated that <br /> cleanup and sand bag removal would be performed until completed. <br /> Sukut Construction continued welding and placing perforated pipes into the"V"ditches on the cell floor. <br /> The blade graded the access road toward the leachate pond as baserock was delivered to the site by transfer <br /> trucks. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-17 <br />