TOR <br /> ENGINEERIN INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 85 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. December 18,2003 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Avre Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cool,cloudy and breezy Ken Davila <br /> Equipment on site: <br /> 1-D6 LGP dozer, 1-backhoe, 1-627 scra er 1-D4 dozer 12-Transfer trucks 1-966 loader orrowed from Forward Inc. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for documentation and observations at the location listed above. Sukut continued hauling <br /> granular drainage material using the transfer trucks. They used the D4 and D6 to spread out the granular <br /> drainage material on the central FU-03 cell floor from east to west throughout the day. After the material <br /> was cut to grade, it was physically checked for depth and the eight-ounce(8oz)geotextile was then placed. <br /> isThe scraper hauled stockpiled clay to be used as operations layer over the geotextile. <br /> One concrete truck was scheduled to arrive on site with nine(9)yards of cement slurry but did not. <br /> The geotextile over the granular drainage material was damaged by the scraper at the access road <br /> boundary with the cell. The area was inspected for damage to material,depth and area size. A small patch <br /> of geotextile was placed over the removed material and covered with operations layer. <br /> Ask <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of i <br /> r-* <br />