My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V TUCTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT* <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 86 <br /> Location of Work: Client Or Manager We: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. December 19,2003 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San seta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Tim Sues Ayre Khounmouang King Bails Sukut superintendent) <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stoc fled, light brown silty CIE Cold, cloudy and breezy, rainn PM Ken Davila <br /> Equipment on site: <br /> 1-D6 LGP dozer, 1-backhoe, 1-627 sora er, 1-D4 dozer 8-Transfer trucks, 1-966 loader Jbocrowed from Forward,Inc. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for documentation and observations at the location listed above. Sukut began hauling <br /> granular drainage material (GDM)using the transfer trucks. They began utilizing the D4 and D6 to spread <br /> the granular drainage material from east to west. In the early morning,I asked the acting on site <br /> superintendent,King B.,if he were going to continue finish grading the granular drainage material to the <br /> north of the placement area and he stated he would not,parked his tracker and left the job site. Hauling and <br /> placement of the GDM continued with the on site foreman, Tim S.,operating the D6 and grading the <br /> material to finished grade. With this number of trucks, approximately 900 tons of GDM would be hauled. I <br /> personally checked the thickness of the material while it was placed next to the D6 because the grade setter <br /> normally on site torform this duty was not on site. The acting foreman stated that they would not return <br /> on site until the 29 of this month. <br /> Coarse gravel was placed over the LCRS pipe in the northeast quadrant for a distance of approximately <br /> fifty feet. <br /> The FU-03 sump pump was set up at various times throughout the day in anticipation of the upcoming <br /> wet weather. <br /> One concrete truck arrived on site in the late afternoon with nine(9)yards of cement slurry and poured <br /> the northeast FU-03 cell anchor trench at the 5:1 and 2:1 slopes. <br /> The conveyor previously used for GDM placement was removed from the jobsite by flatbed truck. <br /> Aak <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> r-7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.