Laserfiche WebLink
TV ry <br /> TOR <br /> ENGINEERING,INC. <br /> DAILY <br /> CONSTRUCTION FIELD REPORT <br /> I* <br /> Project Name: Project No. Daily Field Report Sequence Numba: <br /> Forward Landfill 021605.03 89 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward,Inc. January 6,2004 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: ( : <br /> King Bailey Ayre Khounmouang Lochlin C. Allied <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled,light brown siltyCl a Cool, overcast and breezyKen Davila <br /> Equipment onsite: <br /> 1-D6 LGP dozer, 1-backhoe 1-627 sora er 1-D4 dozer <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> On site today for documentation and observations at the location listed above. I met with the Sukut <br /> foreman in the early morning and he stated that Sukut would be removed from the job site and would not be <br /> returning. After a midmorning meeting, it was officially announced that today would be the last one on site <br /> for Sukut,they would be leaving and that Guinn Construction would arrive on site tomorrow to begin <br /> mobilizing equipment. <br /> It was requested that prior to Sukut's leaving that they winterize the project by filling in the northeast and® <br /> southeast liner edges of the FU-03 cell floor. This was completed by shift's end. <br /> At the request of the client,I made a list for Guinn Construction of things that remained to be completed. <br /> I demobed off site until further notice. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />