Laserfiche WebLink
'LYC"TOR <br /> ENGINEERING INC. <br /> 0 ®A LY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 90 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward,Inc. January 12,2004 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Leta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Matt Morrow Are Khoumn <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stockpiled, light brown silty Clay Cold,overcast and breezy Ken Davila <br /> Equipment on site: <br /> 1-D8 dozer <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> After receiving a phone call from the client to return on site,I arrived and met with Butch S. to meet the <br /> Guinn foreman,Matt M.. He stated that they would be removing material to dewater the site and cutting a <br /> spot on the upper staging area to stockpile granular drainage material. He also stated that they would begin <br /> hauling recycled baserock tomorrow and hauling drainage rock on Wednesday. The dozer was utilized to <br /> perform the above mentioned tasks. <br /> One small hole was cut into the liner at the northeast"V"ditch to relieve the remaining water that was <br /> trapped underneath. A small amount of water came out or was forced out. Since the northeast liner edge had <br /> been covered,no more accumulation of water under the liner has been observed. <br /> Prepared BY: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />