My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING,INC. <br /> 0 <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 92 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. January 14, 2004 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Matt Morrow Are Khounmouang Lochlin C. Allied &Montie C. Vector <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Imported—3/8" Granular Drainage Material Cold, overcast(drizzling)and breezv Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader, 1-D8 dozer. 1-325 excavator, 1-D250 haul truck, 1-LGP d6 dozer 10-MIX durng trucks <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Guinn foreman to discuss today's operations. They began cutting out <br /> the saturated material on the upper staging area to enlarge it and will place more recycled base at a later <br /> date. Operations layer was placed in the southeast comer where depth checks were performed on the <br /> granular drainage material and in the south central floor of the FU-03 cell. The operations layer material <br /> was taken from the on site stockpile. The foreman stated that they would begin placing granular drainage <br /> material tomorrow. <br /> A very brief, informal meeting was held with Lochlin C. and Montie C. to discuss project progress and <br /> scheduling and the clay liner at the northeast corner. It was decided that the clay material would be left to <br /> dry without cutting more holes in the liner. The material is drying sufficiently and is firm to foot pressure. <br /> repared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.