My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TV v-r-aC <br /> "TOR <br /> ENGINEERING INC. <br /> 0 <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 91 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward,Inc. January 13,2004 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer- <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Matt Morrow Ayre Khounmouang Lochlin Caffey Allied <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native, stoc fled, light brown silty Clay Cold, overcast and breezy Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer 1-966 loader <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Guinn foreman to discuss today's operations. He stated that they would <br /> be placing recycled baserock on the upper staging area to have an open space to stockpile granular drainage <br /> material. Ten(10)trucks are scheduled to deliver drain rock tomorrow. <br /> Observations were made at the northeast"V"ditch where the holes in the liner were cut. The water which <br /> had ponded under the liner has all but disappeared. A very small amount remains and it is believed that this <br /> will dissipate over a short period of time. <br /> Lochlin C. was on site to discuss the upcoming schedule for Guinn Construction and the repair work to be <br /> performed by GSE. <br /> IL Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-? <br />
The URL can be used to link to this page
Your browser does not support the video tag.