ilECTOR <br /> WZ <br /> PF ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 96 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. January 20, 2004 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Lay Wellen Are Khounmouan Curtis Donahue Guinn <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Imported—3/8" Granular Drainage Material, Cold,overcast(drizzling)and calm to Ken Davila <br /> imported—1"Coarse Grained Rock and native breezy <br /> stockpiled cla s <br /> Equipment on site: <br /> 1-136 dozer, 1-966 loader, 1-138 dozer, 1-330 excavator,3-13250 haul trucks, 1-LGP D6 dozer, 14-belly dump trucks, 1-D350 haul <br /> truck, 1-TH103 extendalift loader, 8-transfer trucks <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn construction continued placing granular drainage material on the western edge and northwest <br /> corner of the FU-03 cell floor, working south to north. Prior to placing the eight-ounce(8 oz)geotextile,the <br /> thickness of the drainage rock was checked with the measuring rod and also placed using a GPS system <br /> attached to the dozers. Operations layer was placed in the northwest quadrant edge of the cell floor. The <br /> operations layer material was taken from the on site stockpile. Both the minus 3/8 inch and the minus 1 inch <br /> rock were imported throughout the day using the belly dumps and transfers,respectively. <br /> I met with Butch(Forward)to inform him that the liner installer is scheduled to arrive on Thursday(1-22- <br /> 04)morning to perform repairs,the surveyor of record needs to be on site the same day and that Leak <br /> Detection Services should be scheduled for the 27th of this month(next Tuesday). <br /> One sieve analysis was completed on the minus 3/8"granular drainage material and one sample was <br /> obtained of the minus 1"coarse grained material to be used in the cell sump. The—3/8" sieve was within <br /> specifications. <br /> repared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> r-,) <br />