My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V-E ,4� TOR <br /> NGINEERING INC. <br /> Project Name: Project No. Daily Field Report Sequence Number. <br /> Forward Landfill 021605.03 106 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. February 3, 2004 Tuesday <br /> General Contractor. Liner Contractor: Project Engineer. <br /> Guinn Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Curtis Donahue Are Khounmouan <br /> Source and Description of Fill Material: Weather. CQA Technician: <br /> Native stockpiled clay Cold,raining and windy Ken Davila <br /> Equipment on site: <br /> None o eratin <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with the Guinn Construction foreman to discuss the possible work schedule for <br /> today. Because of last night's heavy rains and the continuing rain,he stated that they would be only <br /> removing the GPS equipment from the rented LGP dozer and close for the remainder of the week. <br /> After yesterday's early evening phone call from project manager Montie C. (Vector), he had confirmed <br /> that the field portion of observations and documentation for Vector had been completed and verified by the <br /> 0 client. Other than minor paperwork, the job trailer equipment had begun to be packed and ready for <br /> transportation. The portion of the destructive samples labeled for Forward, Inc., was given to landfill <br /> manager Butch S. <br /> 101 Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.