My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTCITOR <br /> ENGINEERING,INC. <br /> Project Name: Project No. daily Field Report Sequence Number. <br /> Forward Landfill 021605.03 105 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. February 2, 2004 Monday <br /> General Contractor. Liner Contractor. Project Engineer. <br /> Guinn Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Curtis Donahue Ayre Khounmouan <br /> Source and Description of Fill Material: Weather. CQA Technician: <br /> Native stockpiled clay <br /> Cold, cloud (PM-raining) and wind Ken Davila <br /> Equipment on site: <br /> 1-136 dozer, 1-966 loader,2-13250 haul trucks, 1-LGP D6 dozer, 1-330 excavator <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Construction continued grading the FU-03 cell floor operations layer to the proper thickness. The <br /> foreman stated that they would be placing the berms around the cell and grading the roads for the remainder <br /> of the week, depending on the weather. The dozers were utilized to grade the cell floor and were fitted with <br /> a GPS. He also stated that the surveyor is scheduled for Wednesday of this week to check the final grade of <br /> the cell floor. By the early afternoon, pouring rain stopped the workers but the cell floor operations layer <br /> had been completed. Because both dozers were used on the floor, no work was performed on the outer <br /> berms. <br /> Report preparation continued with the compilation of all on site field data sheets and documentation. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.