Laserfiche WebLink
WMU FU -03, WMU F -West Leachate Impoundment and Desilting Basin February 2004 <br />Forward Landfill Job No. 021605.03 <br />performed sieve analysis tests on two (2) evaluation samples and four (4) construction <br />samples of the drainage gravel. In addition, Vector CQA Monitor performed sieve <br />analysis on two (2) evaluation samples and two (2) construction samples of the coarse <br />gravel fill. <br />The results of LCRS granular drainage material sieve analysis indicated 100% passing <br />the 3/8 -inch sieve and less than 3% passing the No. 200 sieve. The results of the <br />coarse gravel sieve analysis indicated 100% passing the 1 -inch sieve, maximum 30% <br />passing the 3/8 -inch sieve, maximum 5% passing the No. 4 sieve and maximum 2% <br />passing the No. 200 sieve. <br />Hydraulic conductivity testing of the granular drainage material indicated an average <br />flow rate of 5 cm/sec, which exceeds the requirement of 0.5 cm/sec. The hydraulic <br />conductivity testing results for the coarse gravel exceeded the laboratory equipment <br />capacity of 10 cm/sec, which exceeds the requirement of 5 cm/sec. <br />A summary of the laboratory testing conducted on the granular drainage layer and the <br />coarse gravel are presented in Tables 5 and 6, respectively. The laboratory test results <br />of the drainage gravel and coarse gravel testing are included in Appendix F and <br />Appendix G, respectively. <br />Table 5 — Granular Drainage Material Laboratory Testing Summary <br />SAMPLEGRAIN <br />NUMBER <br />DATE <br />SOIL DESCRIPTION <br />SIZE <br />3/8" -200%® <br />PERM. <br />K cm/sec <br />Specifications', <br />100% <br />43% <br />>0.1 cm/sec <br />Evaluation Testin <br />GCM -2E <br />3/8" <br />Pea Gravel <br />100 <br />0 <br />10 <br />GDM -3E <br />3/8" <br />Pea Gravel <br />100 <br />0.4 <br />3 <br />Construction Testing <br />GDM -1 <br />3/8" <br />Pea Gravel <br />100 <br />0.5 <br />4 <br />GDM -2 <br />3/8" <br />Pea Gravel <br />100 <br />0.3 <br />4 <br />GDM -3 <br />3/8" <br />Pea Gravel <br />100 <br />0.3 <br />6 <br />GDM -4 <br />3/8" <br />Pea Gravel <br />100 <br />0.5 <br />3 <br />0 <br />Vector Engineering, Inc. - 143E Spring Hill Drive - Grass Valley, CA 95945 - (530) 272-2448 <br />-16- <br />