My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU -03, WMU F -West Leachate Impoundment and Desilting Basin <br />Forward Landfill <br />5.3.2 Geomembrane Installation <br />5.3.2.1 Geomembrane Deployment <br />e Surface Preparation <br />February 2004 <br />Job No. 021605.03 <br />Prior to installation of the HDPE, Vector's CQA Monitor inspected that the GCL has <br />been installed as specified by the project specifications and there was no change in <br />surface condition that required repair work. <br />e Anchor Trenches and Sumps <br />Prior to commencement of geomembrane installation, Vector's CQA Monitor verified <br />that the anchor trenches were suitable for geomembrane installation and free of loose <br />soil or deleterious material. After completion of geosynthetics deployment, Vector's <br />CQA Monitor verified and documented that the backfill for the anchor trenches was <br />placed and compacted in accordance with the project specifications and no damage <br />occurred to the geosynthetics material. <br />e Layout Drawing <br />The liner contractor, GSE, submitted a proposed panel layout drawing that showed the <br />general panel configurations and dimensions. The drawings were approved by Vector <br />prior to the installation of the HDPE geomembrane. <br />e Field Panel Identification <br />Prior to geomembrane deployment, Vector's CQA Monitor and GSE discussed and <br />agreed to the identification code for each panel deployed. During the deployment, <br />Vector's CQA Monitor verified that the installer marked the panels deployed and that <br />each panel placed was marked with the manufacturer's roll number. <br />e Field Panel Placement <br />During the panel placement, Vector's CQA Monitor kept panel deployment logs. These <br />logs recorded the location (panel number and roll number), installation schedule (date <br />and time), weather conditions (temperature and wind), and thickness of the sheet. <br />These panel deployment logs are presented within Appendix I. <br />0 <br />Vector Engineering, Inc. - 143E Spring Hill Drive - Grass Valley, CA 95945 - (530) 272-2448 <br />-25- <br />
The URL can be used to link to this page
Your browser does not support the video tag.