Laserfiche WebLink
WMU FLI-03,WMU F-West Leachate Impoundment and Desilting Basin February 2004 <br /> Forward Landfill Job No.021605.03 <br /> 7.0 CONCLUSION <br /> The completion of construction work requiring CQA observation occurred in early <br /> February 2004. Based on our observations and testing during the construction of the <br /> WMU FU-03 composite liner system, desilting basin, and WMU F-West Leachate <br /> Impoundment at the Forward Landfill, it is Vector's professional judgment that the <br /> construction was completed in general accordance with the project plans and <br /> specifications, CQA plan, applicable regulations, and approved design modifications. <br /> Vector Engineering, Inc. - 143E Spring Hill Drive- Grass Valley, CA 95945 -(530)272-2448 <br /> -33- <br />