My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-03,WMU F-West Leachate Impoundment and Desilting Basin February 2004 <br /> Forward Landfill Job No.021605.03 <br /> 6.0 POLYETHYLENE PIPE AND FITTINGS <br /> 6.1 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA Monitor performed the receiving <br /> inspection of the HDPE piping, which consisted of: <br /> • verify that the pipe is the proper size and dimensions, <br /> • visually inspect the pipe for any damage that may have occurred during <br /> transportation and handling, <br /> • verify and document that storage of the pipe was in accordance with the project <br /> specifications, and <br /> • documentation required by the specifications was received. <br /> Documentation for the HDPE pipe is included in Appendix N. <br /> 6.2 Installation <br /> Vector's CQA Monitor observed that the pipe was installed at the locations specified in <br /> the construction drawings, and no damage occurred during the placement and backfill <br /> around and over the pipe. Vector's CQA Monitor spot-monitored the fusion welding <br /> operations to ensure that the welding followed the project specifications. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive •Grass Valley, CA 95945 •(530)272-2448 <br /> -32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.