Laserfiche WebLink
V TEV "TOR <br /> ENGINEERING INC. <br /> DAILY <br /> CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 37 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward,Inc. October 20,2003 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Warm, clear and Ken Davila <br /> bree <br /> Equipment on site: <br /> 1-D6 dozer, 1-water truck, 1-D5 dozer, 1-633 sora er 1- 16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site today and met with Sukut's foreman to discuss the week's plan of operation. Sukut <br /> Construction continued the earthworks operations with the 16G blade cutting the east FU-03 cell floor area <br /> and the scraper hauling the excess cut material to the stockpile. The D6 dozer continued cutting the north <br /> and east slopes of the leachate pond and the D5 dozer continued cutting the south and east slopes and the <br /> floor of the desilting pond. Sukut's surveyors were on site today to plot points on the cell floor. <br /> Review of the certifications of all delivered products continued throughout the day. On site lab testing o <br /> the clay material continued with one(1)bulk composite bucket being obtained from the stockpile. Samples <br /> were split,weighed and placed into the oven for moisture content and tomorrow's testing. The material will <br /> be tested for Atterberg limits,proctor curve and sieve analysis(gradation). <br /> Bryan F. (Vector)verbally informed me by phone that permeability test numbers CL-1 through CL-4 had <br /> preliminary results that were within specification and that final values could be obtained before the weekly <br /> meeting on Wednesday(10-22-03). <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,7 <br />