My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17ECTOR <br /> ENGINEERING INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 38 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. October 21,2003 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, light brown silty CLAY Hot, clear and Ken Davila <br /> breezy <br /> Equipment on site: <br /> I-D6 dozer, 1-water truck, 1-DS dozer, 1-633 scra er, 1-16G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site today for testing and observations at the location listed above. The foreman for Sukut was <br /> grade setting in the morning so we couldn't discuss the day's plan of operation. Sukut Construction <br /> continued the earthworks operations with the 16G blade and D5 dozer cutting the east FU-03 cell floor area <br /> and the scraper hauling the excess cut material to the stockpile. In the afternoon,the blade moved to the <br /> north cell floor and the D5 moved back to cutting the desilting basin's north slope. The D6 dozer continued <br /> cutting the north and east slopes of the leachate pond. Sukut's surveyors were on site today to plot points on <br /> the cell floor and various other locations. <br /> Review of the certifications and an on site check-in of geocomposite began and will continue throughout <br /> the day. At shift's end,all rolls of geocomposite had been accounted for and were logged in. On site lab <br /> testing of the clay material continued with the set up of two(2)Atterberg limits and two sieve analyses <br /> (gradations). Both were left to soak overnight as per ASTM standards. <br /> Photos of the grading operations at the various work areas were taken in the morning. <br /> Adak <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />
The URL can be used to link to this page
Your browser does not support the video tag.