717 T <br /> ZJUC OR <br /> Pr ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 42 <br /> Location of Work: Client Or Manager Date: -T Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. October 25, 2003 S44" <br /> da <br /> Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David Hasal/King Bailey Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Hot,clear and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> 1-D5 dozer, 1-water truck, 1-825 com actor,2-633 scra ers, 1- 16G blade, 1-14G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with King B. (Sukut superintendent)in the early morning to discuss the anchor <br /> trench details around the lechate pond and yesterday's survey. The distance of the north lechate anchor <br /> trench from the crest of slope appears that it will contact an existing gas well. Apparently,the well or the <br /> anchor trench need to be moved. Also,the east lechate pond anchor trench appears to cut off any access <br /> between the FU-03 cell and the lechate pond because of the distance from the toe of slope to the anchor <br /> trench. General earthworks operations continued with the two(2)blades beginning to finish cut the clay in <br /> the central floor area previously placed. The two(2) scrapers hauled stockpiled material to the east and west <br /> cell floor areas where the sheepsfoot compactor applied compactive effort and the water truck moisture <br /> conditioned. The D5 dozer ripped the stockpile in front of the scrapers. <br /> Review of the conformance results,the roll certifications of the Bentofix GCL and the geotextile (16oz) <br /> material continued as time permitted. On site lab testing of the clay material continued with another <br /> completion of one(1)more Atterberg limits test. Calculations and test plotting will be performed tomorrow <br /> after overnight oven drying. <br /> Ten(10)nuclear moisture density tests were performed at random locations and elevations throughout the <br /> day. All tests passed the 90%compaction specification and also passed in moisture content. The on site <br /> foreman for Sukut was verbally informed of the test results. <br /> In the mid-aftemoon, Lochlin C. (Allied)called and I informed him of the concerns of the lechate pond <br /> anchor trench. He stated that I should contact the design engineers on Monday(10-27-03)to discuss <br /> possible options. <br /> pared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> C-17 <br />