My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ViTINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 43 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. October 26, 2003 Sunda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Sukut Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Other: <br /> David HasaMng Bailey Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On site native, stockpiled, light brown silty Hot, clear and Ken Davila <br /> CLAY breezy <br /> Equipment on site: <br /> 1-D5 dozer, 1-water truc 1-825 com actor, 1-633 scraper, 1-2 6G blade i-14G blade, 1-backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I arrived on site and met with King B. (Sukut superintendent)in the early morning to discuss the day's <br /> plan of operation. General earthworks operations continued with the one(1) scraper hauling minor amounts <br /> of stockpiled clay and windrows generated by the two blades. The two(2)blades continued to finish cut the <br /> clay on the cell floor. The blades used serrated edges in the morning to rough cut the clay and in the late <br /> afternoon used the smooth edges to begin finishing. The sheepsfoot compactor applied compactive effort a <br /> the water truck moisture conditioned. The D5 dozer cleaned and widened the access road into the cell which <br /> will be used for general truck access. <br /> Review of the roll certifications of the Bentofix GCL and the geotextile(16oz)material continued as time <br /> permitted. On site lab testing of the clay material continued with another completion of two(2)more <br /> Atterberg limits tests. Calculations and test plotting will be performed tomorrow after overnight oven <br /> drying. These last two tests will complete the required minimum testing frequency for Atterberg limits. One <br /> permeability drive tube sample was obtained and will be transported to off site Vector personnel tomorrow <br /> for testing in the Vector laboratory. <br /> Seventeen (17)nuclear moisture density tests were performed at random locations and elevations <br /> throughout the day. All tests passed the 90%compaction specification and also passed in moisture content. <br /> The on site foreman for Sukut was verbally informed of the test results. <br /> Prepared,By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.