Laserfiche WebLink
Construction and demolition wastes shall be processed prior to being applied to the working <br /> i face.Prior to spreading and compacting on the working face, these materials shall comply with <br /> a grain size specification by volume of 95 percent less than 12 inches and 50 percent less than 6 <br /> inches as determined by the EA. The CIWMB shall provide technical assistance in making this <br /> determination if requested by the EA.Alternative processing and grain size specification <br /> requirements may be approved by the EA if the EA determines that the alternative meets the <br /> performance requirements of(a)(2)and(a)(3)of this section and the CIWMB concurs." <br /> Revise in accordance with Title 27 CCR Section 20690(b)(9)(c). <br /> 18. Page 6-13, Section 6.4.7, Refuse to Cover Ratios: See Comments 6 and 7. <br /> 19. Page 6-27, Section 6.5, Salvaging and Volume Reduction: This section makes <br /> reference to Lionudakis as the operator of the Resource Recovery Facility. Revise to <br /> reflect actual conditions at the site. <br /> 20. Page 6-30, Section 6.6.3,Communications: This Section makes reference to Pacific <br /> Bell as the provider of the communication systems at the site. Pacific Bell is no longer <br /> in business under that name. Revise to provide updated information. <br /> If you have any questions regarding this matter please contact me at(209)468-0332 <br /> Sincerely, <br /> Robert ivlcClellon, Supervising REHS <br /> Environmental Health Department <br /> Cc: Keith Kennedy, MS 15,California Integrated Waste Management Board <br /> John Boucher, Bryan A. Stirrat and Associates <br /> Page 3 of 3 <br />