Laserfiche WebLink
TABLE 1 <br /> FORWARD LANDFILL <br /> SWRCB JTD INDEX <br /> Design Report-preliminary and as-built plans 21760(a)(1) As-Built plans will be <br /> i submitted to the RWQCB <br /> I upon completion of the <br /> landfill or any portion <br /> thereof. <br /> Design Report 21760(a)(3)- 6.0-pp.6-1 thru 6-31, <br /> g p 7.1, 7.2, 7.3- pp. 7-1 thru <br /> (a)(4) 7-10 <br /> Operation Plan i - - ---�-- 21760(b)-(b)(3) 6.0-pp.6-1 thru 6-31, <br /> P 7.0-pp.7-1 thru 7-21 <br /> Subchapter 4. Development of Closure/Post-Closure Maintenance Plans <br /> '21769. SWRCB-Closure and Post-Closure Maintenance Plan Requirements. <br /> Prelim.CI/P-CI Plan-purpose 21769(b)(1) Appendix L <br /> Appendix L <br /> Prelim.CVP-CI Plan Contents-cost analysis 21769(b)(2)- <br /> (b)(2)(13)5. <br /> Final CVP-Cl Plan 21769(c)- NA <br /> (c)(2)(H)3. <br /> Chapter 5. Enforcement <br /> Article 4. Enforcement by Regional Water Quality Control Board (RWQCB) ** <br /> '22190. SWRCB-Mandatory Closure(Cease and Desist 22190(b) If early closure <br /> Orders). mandated:IWMD will <br /> comply with RWQCB <br /> orders. <br /> Chapter 6. Financial Assurances at Solid Waste Facilities and at Waste Management <br /> Units for Solid Waste <br /> Subchapter 2. Financial Assurance Requirements <br /> Article 1. Financial Assurance for Closure <br /> '22207. SWRCB-Closure Funding Requirements. [22207(a) Section 5.4 of Appendix <br /> L <br /> Article 2. Financial Assurance for Postclosure Maintenance <br /> 122212. SWRCB-Post-Closure Funding Requirements. 22212(a) T Section 5.4 of Appendix <br /> L <br /> Article 4. Financial Assurance Requirements for Corrective Action <br /> 122222. SWRCB-Corrective Action Funding Requirements. 22222 The current WDRs are <br /> located in Appendix A <br /> and 7.2.4-pp. 7-6 thru <br /> Forward Landfill JTD 7 of 7 <br /> J:\Allied\Forward\)TD Amendment\Final JTD Amendment\SWRCBIDX.doc:05/23/02) <br /> Amendment No.1:8/1/2005 <br /> BRYAN A.STIRRAT&ASSOCIATES <br />