Laserfiche WebLink
TABLE 2 <br /> FORWARD LANDFILL <br /> CIWMB JTD INDEX <br /> CIWMB Section SWRCB Section JTD Page(s) <br /> CIWMB JTD Requirements No. No. <br /> General <br /> Name of Facility,Site Operator and Owner 21600(b)(1)(A) 1.1 - P. 1-1 <br /> Description of the Operation Cycle 21600(b)(1)(A) 6.0- pp.6-1 thru <br /> 6-31 <br /> Site Plan Including Boundaries,Acreage,and Buffer Zones 21600(b)(1)(B) Drawings 2, 3, 4, <br /> 5 and Figure 3 <br /> Hours of Operation 21600(b)(1)(C) 6.1 - p.6-1 <br /> Waste Classification and Management <br /> Types and Quantities of Waste 21600(b)(2)(A) 21740(a)(1) 4.2, 4.3,4.4 pp. <br /> 4-6 thru 4-10 <br /> Waste Management Unit Classification and Siting <br /> Airport Safety 21600(b)(3)(A) 2.4 - pp.2-3 thru <br /> 2-4 <br /> Volumetric Capacity 21600(b)(3)(B) 4.5 &4.6 - pp.4- <br /> 10 thru 4-1'2 <br /> Site Life Estimate 21600(b)(3)(C) 4.6 &4.7 - pp. 4- <br /> 10 thru 4-13 <br /> Site Location (vicinity map) 21600(b)(3)(D) 2.2 - pp. 2-1 thru <br /> 2-2 <br /> Surrounding Land Use and Zoning(plot plan) 21600(b)(3)(E) 21750(h)4 2.3 - pp. 2-2 thru <br /> 2-3 <br /> Ancillary Facilities(include on plot plan) 21600(b)(3)(F) 2.2 -pp.2-1 thru <br /> 2-2, Drawing 2 <br /> Design and Construction Standards for All Waste Management Units <br /> Design Responsibility 21600(b)(4)(A) 21750(a-h) 3.0 - pp.3-1 <br /> (Describe how the site design provides for the thru 3-18, 5.2 - <br /> surrounding physical setting) pp. 5-1 thru 5-13 <br /> / <br /> Design Responsibility 21600(b)(4)(B) 5.2 -pp. 5-1 <br /> thru 5-13 <br /> (New disposal sites shall be designed under a civil engineer/ <br /> Construction Sequencing Plans 21600(b)(4)(C) 5.2.5 - pp. 5-8 <br /> thru 5-9 <br /> Grading Plan 21600(b)(4)(D) 21090(b)-(b)(3) 5.2.3 - pp. 5-4 <br /> thru 5-5 <br /> flnclude existing and proposed final contours <br /> for disposal area and borrow area) <br /> Gas Management Plan 21600(b)(4)(E) 5.2.7 - pp. 5-11 <br /> thru 5-13, 5.3.7 <br /> - pp.5-25 thru <br /> 5-26, 7.5 - pp. 7- <br /> 11 thru 7-14 <br /> (Demonstrate the ability to comply with T2720919,20919.5 and <br /> gas control for closure plans/ <br /> Forward Landfill JTD 1 of 5 <br /> 0.\Allied\Forward\ITD Amendment\Final JTD Amendment\CIWMBIDX.doc:05/23/02) <br /> Amendment No.1:8/1/2005 BRYAN A.STIRRAT&ASSOCIATES <br />