Laserfiche WebLink
Survey Control <br /> The survey control crew, under the direction of the contractor will be <br /> responsible for surveyed location of the closure plan improvements and for <br /> record drawing information. They will be responsible for establishing survey <br /> control to verify that the various components of the cover conform to grade <br /> and/or thickness requirements of the construction drawings and specifications. <br /> CQA For Final Cover Placement <br /> The construction specifications will include the CQA Plan for final cover <br /> placement. A geotechnical CQA crew, under the direction of a Geotechnical <br /> Engineer, will be on-site full-time during the placement of the final cover to <br /> monitor compliance with cover design and installation methods included in the <br /> CQA Plan. The CQA personnel will have day-to-day responsibility to oversee <br /> cover placement and to evaluate whether the cover is constructed according to <br /> specifications. <br /> Forward Landfill PFCPCMP 3-18 <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec3.doc:6/15/2005 <br />