My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
= Geotechnical Technician(s) <br /> Labor Crews <br /> Equipment Operators <br /> Surveyors <br /> - Mechanics <br /> 3.13.2 CONSTRUCTION SCHEDULE <br /> The AVSL closure construction schedule includes the following tasks conducted <br /> over the corresponding time lines: <br /> • Equipment Mobilization 2 weeks <br /> • Interim/Foundation Layer Preliminary Grading 1-1/2 weeks <br /> • Placement of Monolithic Cover Layer 8 weeks <br /> • Drainage Control Systems Construction 5 weeks <br /> • Survey/Settlement Monument Installation 1 week <br /> • French Drain Leachate Seep Collector Installation 2 weeks <br /> • Landfill Gas Control System Protection/Reinstallation 9 weeks <br /> • Erosion Control Installation 2 weeks <br /> • Demobilization 1 week <br /> As shown on Table 5 closure construction will occur over a 12-week period <br /> assuming there are no delays due to weather and/or equipment/personnel <br /> downtime. <br /> 3.13.3 CONSTRUCTION MANAGEMENT <br /> A construction management team will be on-site during the entire period of <br /> construction. The team will be under the direction of a construction manager, <br /> who will be responsible for supervision of construction of the various features <br /> included in the closure plan. The construction manager will coordinate the <br /> activities of the on-site contractor(s) and will provide liaison among the design <br /> engineers and the contractors. Other key staff may include a site engineer and <br /> construction inspector(s). A survey crew and a geotechnical CQA crew will be <br /> present, as required. <br /> Forward Landfill PFCPCMP 3-17 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-secldoc:6/15/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.