= Geotechnical Technician(s) <br /> Labor Crews <br /> Equipment Operators <br /> Surveyors <br /> - Mechanics <br /> 3.13.2 CONSTRUCTION SCHEDULE <br /> The AVSL closure construction schedule includes the following tasks conducted <br /> over the corresponding time lines: <br /> • Equipment Mobilization 2 weeks <br /> • Interim/Foundation Layer Preliminary Grading 1-1/2 weeks <br /> • Placement of Monolithic Cover Layer 8 weeks <br /> • Drainage Control Systems Construction 5 weeks <br /> • Survey/Settlement Monument Installation 1 week <br /> • French Drain Leachate Seep Collector Installation 2 weeks <br /> • Landfill Gas Control System Protection/Reinstallation 9 weeks <br /> • Erosion Control Installation 2 weeks <br /> • Demobilization 1 week <br /> As shown on Table 5 closure construction will occur over a 12-week period <br /> assuming there are no delays due to weather and/or equipment/personnel <br /> downtime. <br /> 3.13.3 CONSTRUCTION MANAGEMENT <br /> A construction management team will be on-site during the entire period of <br /> construction. The team will be under the direction of a construction manager, <br /> who will be responsible for supervision of construction of the various features <br /> included in the closure plan. The construction manager will coordinate the <br /> activities of the on-site contractor(s) and will provide liaison among the design <br /> engineers and the contractors. Other key staff may include a site engineer and <br /> construction inspector(s). A survey crew and a geotechnical CQA crew will be <br /> present, as required. <br /> Forward Landfill PFCPCMP 3-17 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-secldoc:6/15/2005 <br />