Laserfiche WebLink
6.2.2 DRAINAGE CONTROL SYSTEM <br /> Costs for the drainage system include the construction of the AC downdrains, <br /> inlet structures, and deck berm. <br /> 6.2.3 EROSION CONTROL <br /> This category covers the cost of landscaping which includes soil preparation and <br /> planting of vegetative materials and installation of erosion control devices. <br /> 6.2.4 LANDFILL GAS CONTROL SYSTEM <br /> This category includes the cost for phased removal and reinstallation of the <br /> existing landfill gas system header and reconnection of wells during grading and <br /> final cover construction in the Stage IA partial closure area. <br /> 6.2.5 LANDFILL GAS MONITORING SYSTEM <br /> No costs are associated with this category since no additional gas monitoring <br /> facilities are proposed for the closure of Stage IA. <br /> 6.2.6 GROUNDWATER MONITORING SYSTEM <br /> No costs are associated with this category since no additional groundwater <br /> monitoring facilities are proposed for closure of Stage IA. <br /> 6.2.7 FRENCH DRAIN LEACHATE SEEP COLLECTORS <br /> This category includes costs for installation of the french drain leachate seep <br /> collectors in the Stage IA partial closure area. <br /> 6.2.8 SITE SECURITY/SIGNAGE <br /> No costs are associated with this category since additional fencing and signage is <br /> not required for closure of Stage IA. <br /> Forward Landfill PFCPCMP 6-2 <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc:6/9/2005 <br />