6.2.9 STRUCTURE REMOVAUDECOMMISSIONING OF ENVIRONMENTAL <br /> CONTROL SYSTEMS <br /> No costs are associated with this category since no structure removal or <br /> decommissioning of environmental systems is required for closure of Stage IA. <br /> 6.2.10 ENGINEERING DESIGN <br /> This category includes costs for the preparation of construction level engineering <br /> design plans and specifications for bid purposes. This cost is assumed to be two <br /> percent of the construction cost. <br /> 6.2.11 CONSTRUCTION MANAGEMENT <br /> The construction management cost for the Stage IA closure is based on the <br /> closure construction period. This cost is assumed to be 4 percent of the <br /> construction cost. <br /> 6.2.12 CONTINGENCY <br /> A 20 percent contingency factor has been added to the construction cost <br /> estimate. <br /> 6.3 DISBURSEMENT OF FUNDS <br /> In accordance with 27 CCR, Section 21800, the operator is required to provide a <br /> detailed schedule for disbursement of funds for closure for advance payment of <br /> closure construction activities to be performed in accordance with the Plan or <br /> reimbursement of costs to be performed in accordance with the Plan. Table 7 <br /> shows the anticipated disbursement of funds necessary to complete construction <br /> for Stage IA partial closure area of the Forward Landfill. Forward Landfill Inc. will <br /> request a release of funds from the CIWB Financial Assurance Branch prior to <br /> the start of closure construction activities. <br /> Forward Landfill PFCPCMP 6-3 <br /> ]:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc:6/9/2005 <br />