My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4 POST-CLOSURE MAINTENANCE COST ESTIMATE <br /> The post-closure maintenance cost estimate has been prepared utilizing <br /> information contained in Section 4.0 and estimates of manpower, materials and <br /> equipment to maintain the Forward Landfill in compliance with current <br /> applicable regulations. <br /> The total annual maintenance and monitoring cost estimate for post-closure is <br /> shown on Table 8. These costs are projected in 2005 dollars, assuming no change <br /> in the regulatory environment with respect to the Forward Landfill. The total 30- <br /> year post-closure maintenance cost estimate shown on Table 8, was calculated by <br /> multiplying the annual cost estimate by 30. The total 30-year post closure cost <br /> obligation does not factor in inflation or interest over the funding period. The <br /> actual future value of the 30-year total may be different. Annual funding will be <br /> calculated year to year in accordance with 27CCR, Section 22225. <br /> The post-closure cost estimate does not include the items listed below as those <br /> costs will be handled as part of ongoing landfill operations. <br /> • Landfill Gas Control System Monitoring and Maintenance <br /> • Groundwater Monitoring System Maintenance and Repair <br /> • Groundwater Monitoring <br /> • Stormwater Monitoring <br /> • Site Security <br /> It should be noted that the maintenance and monitoring costs presented have <br /> been projected utilizing current regulations and applicable requirements. In the <br /> event that changes occur in the regulatory conditions pertaining to the Forward <br /> Landfill, these estimates will be adjusted accordingly, if necessary, and submitted <br /> to the CIWMB, LEA and RWQCB. <br /> Forward Landfill PFCPCMP 6-4 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc:6/9/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.