Laserfiche WebLink
6.4 POST-CLOSURE MAINTENANCE COST ESTIMATE <br /> The post-closure maintenance cost estimate has been prepared utilizing <br /> information contained in Section 4.0 and estimates of manpower, materials and <br /> equipment to maintain the Forward Landfill in compliance with current <br /> applicable regulations. <br /> The total annual maintenance and monitoring cost estimate for post-closure is <br /> shown on Table 8. These costs are projected in 2005 dollars, assuming no change <br /> in the regulatory environment with respect to the Forward Landfill. The total 30- <br /> year post-closure maintenance cost estimate shown on Table 8, was calculated by <br /> multiplying the annual cost estimate by 30. The total 30-year post closure cost <br /> obligation does not factor in inflation or interest over the funding period. The <br /> actual future value of the 30-year total may be different. Annual funding will be <br /> calculated year to year in accordance with 27CCR, Section 22225. <br /> The post-closure cost estimate does not include the items listed below as those <br /> costs will be handled as part of ongoing landfill operations. <br /> • Landfill Gas Control System Monitoring and Maintenance <br /> • Groundwater Monitoring System Maintenance and Repair <br /> • Groundwater Monitoring <br /> • Stormwater Monitoring <br /> • Site Security <br /> It should be noted that the maintenance and monitoring costs presented have <br /> been projected utilizing current regulations and applicable requirements. In the <br /> event that changes occur in the regulatory conditions pertaining to the Forward <br /> Landfill, these estimates will be adjusted accordingly, if necessary, and submitted <br /> to the CIWMB, LEA and RWQCB. <br /> Forward Landfill PFCPCMP 6-4 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 6.doc:6/9/2005 <br />