Laserfiche WebLink
A . r 0 1 0 <br />State of California <br />CIWMB 216 (Rev. 02/04) <br />California Integrated Waste <br />Management Board <br />FI Amendment Determination Checklist <br />Attached are the following items: <br />® JTD Index <br />Date of LEA received package: 12/22/2008 <br />® Application form <br />® A copy of the RFI Amendment <br />Date LEA denied RFI Amendment: <br />❑ New CEQA documentation since the last <br />permit was issued (including any exemptions) <br />® Other: RFI Changes covered by existing CEQA <br />Date LEA accept RFI Amendment: 01/21/2009 <br />The LEA determination should answer the following questions: <br />1) What are the changes covered by the RFI Amendment? <br />The Preliminary Closure Post Closure Plan was amended to include a phase closure of the site <br />2) Is the proposed change(s) consistent with CEQA? ® YES ❑ NO <br />What CEQA documents were used to determine this? <br />FEIR SCH # 20011052081 <br />Has the LEA determined that the change would not create any adverse environmental impacts and is exempt from CEQA? <br />❑ YES ❑ NO <br />What exemption classification did the LEA or other lead agency use? <br />3) Does the proposed change impact the facility's ability to comply with financial assurances and operating liability? <br />❑ YES ®NO <br />4) Is the proposed change consistent with state minimum standards? ® YES ❑ NO <br />Will the change exacerbate any current compliance problems at the facility? ❑ YES ® NO <br />Would implementation of the change effect the operator in complying with any enforcement order? <br />❑ YES ® NO <br />5) Does this change conflict with any part of the governing permit? ❑ YES ® NO <br />7) Will the proposed change in the RFI Amendment require the operator to amend the closure post closure plan? <br />® YES ❑ NO <br />8) Any additional information required by the operator: <br />The change is to the Closure Post Closure Plan <br />Additional Information: <br />The information was previously approved as part of a Partial Final Closure Plan for Stage IA, but never incorporated in <br />the Preliminary Closure Post Closure plan that is located in the Joint Technical Document <br />Completion of this form is not required by regulation, however, it will provide the CIWMB with the information required by <br />27 CCR 21665. <br />