Laserfiche WebLink
LFG CONTROL CORPORATION REPORT DAILYR <br />CONSTRUCTION E ORT <br />REPORT NO: <br />DATE: <br />WEATHER: <br />PROJECT: Forward Landfill 2009 Gas System Improvements <br />CLIENT: Allied Waste <br />CONTRACTOR: American Environmental Group <br />CONTRACTOR PERSONNEL: 10 <br />EQUIPMENT ON SITE: Excavator, Drill Rig, Track Loader, 2 OHV's, 4 <br />3 Equipment Trailers, Fusion Machines <br />MATERIAL RECEIVED: None <br />VISITORS: Ruben Ramirez, Landfill Operations Manager <br />2 <br />5/27/2009 <br />Clear/ Hot <br />6" PIPE DIA. PIPE DIA. PIPE DIA. <br />350' TRENCHED TRENCHED TRENCHED <br />300' PIPE INSTALLED PIPE INSTALLED PIPE INSTALLED <br />VALVE(S) VALVE(S) VALVE(S) <br />CONSTRUCTION ACTIVITIES <br />AEG conducted safety meeting. Installed 300' of 6" lateral pipe, trenched 350 and backfilled 300'. <br />The 6" lateral started at EW FU08-04. Drilled EW FU08-01 to 40' de th and installed 20' of solid and <br />20' of perforated pipe; backfilled as per plans. Drilled EW FU08-04 to 35' de th and installed 20' of solid <br />and 15' of perforated pipe, backfilled as per plans. Drilled EW FU06-17 to 49' depth and installed 20' <br />solid and 29' perforated pipe; backfilled as per plans. Placed spec. temp PVC caps on all three wells. <br />Imported onsite clean trench backfill throughout day. Drill crew offsite at 2:15. Drilling can't proceed <br />until FAA permit is attained. Drilling started at 7:30 A.M. Pipe crew started trenching at 6:45 prox. <br />By <br />Loren Rush <br />Resident Project Representative <br />