My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2006-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 2:07:00 PM
Creation date
7/3/2020 10:50:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2006-2009
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006-2009.tif
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LFG CONTROL CORPORATION <br />DAILY TR CTION REPORT <br />REPORT NO: 7 <br />DATE: 6/3/2009 <br />WEATHER: Pt. Cloudy / E. Wind <br />PROJECT: Forward Landfill 2009 Gas System Improvements <br />CLIENT: Allied Waste <br />CONTRACTOR: American Environmental Group <br />CONTRACTOR PERSONNEL: 10 <br />EQUIPMENT ON SITE: Excavator, Drill Rig, Track Loader, 3 OHV's, 4 Pickup Trucks <br />3 Equipment Trailers, Fusion Machines, Backhoe, Dozer <br />MATERIAL RECEIVED: None <br />VISITORS: Ruben Ramirez <br />PIPE DIA. PIPE DIA. PIPE DIA. <br />TRENCHED TRENCHED TRENCHED <br />PIPE INSTALLED PIPE INSTALLED PIPE INSTALLED <br />VALVE(S) or TEE(S) VALVE(S) or TEE(S) VALVE(S) or TEE(S) <br />CONSTRUCTION ACTIVITIES <br />Continued to place cover and grade site to match existing grades. Demobilized site. Cleaned u <br />la down area. Verified pressure test at 201b. from EW FU08-01 4" lateral riser. Painted all well <br />head PVC com onents with industrial enamel to match existing. Painted 18" header connection <br />PVC fittings. <br />Items remaining: Well I.D. tags. <br />By <br />Loren Rush <br />Resident Project Representative <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.