Laserfiche WebLink
LFG CONTROL CORPORATION <br />DAILY TR CTION REPORT <br />REPORT NO: 7 <br />DATE: 6/3/2009 <br />WEATHER: Pt. Cloudy / E. Wind <br />PROJECT: Forward Landfill 2009 Gas System Improvements <br />CLIENT: Allied Waste <br />CONTRACTOR: American Environmental Group <br />CONTRACTOR PERSONNEL: 10 <br />EQUIPMENT ON SITE: Excavator, Drill Rig, Track Loader, 3 OHV's, 4 Pickup Trucks <br />3 Equipment Trailers, Fusion Machines, Backhoe, Dozer <br />MATERIAL RECEIVED: None <br />VISITORS: Ruben Ramirez <br />PIPE DIA. PIPE DIA. PIPE DIA. <br />TRENCHED TRENCHED TRENCHED <br />PIPE INSTALLED PIPE INSTALLED PIPE INSTALLED <br />VALVE(S) or TEE(S) VALVE(S) or TEE(S) VALVE(S) or TEE(S) <br />CONSTRUCTION ACTIVITIES <br />Continued to place cover and grade site to match existing grades. Demobilized site. Cleaned u <br />la down area. Verified pressure test at 201b. from EW FU08-01 4" lateral riser. Painted all well <br />head PVC com onents with industrial enamel to match existing. Painted 18" header connection <br />PVC fittings. <br />Items remaining: Well I.D. tags. <br />By <br />Loren Rush <br />Resident Project Representative <br />I <br />