My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> Cover thickness and grade checking was performed by the Contractor on a <br /> continual basis during construction of the closure. At the completion of the <br /> cover construction, several test pits were excavated to determine the required <br /> 4-foot thickness was achieved. These test pits were excavated separately from <br /> the steel plates, thereby verifying the required thickness was achieved. Vector's <br /> CQA monitor observed the test pits and thickness verification. The test pits were <br /> backfilled and compacted per project specifications. <br /> Settlement markers were also installed on the final cover to monitor settlement <br /> with time. <br /> 4.3 Granular Drainage Material <br /> The granular drainage material was placed in the seep collectors of the Stage <br /> lA closure. The granular drainage material satisfied the project specifications. <br /> No conformance testing was required on the granular drainage material. The <br /> granular drainage material was obtained from an off-site source. The granular <br /> drainage gravel was placed directly in the seep collector over the geomembrane. <br /> Vector's CQA Monitor continuously observed the placement of these materials <br /> to ensure no damage occurred to the underlying geosynthetics. <br /> 4.4 Erosion and Sediment Control <br /> Vector's CQA Monitor observed the construction of the surface drainage <br /> features required to accommodate the run-on and run-off flows. The drainage <br /> control features included various v-ditches, berms and downchutes. <br /> Downchutes were constructed using asphalt concrete. Vector's CQA Monitor <br /> observed the drainage feature construction to ensure the requirements of the <br /> project drawings and specifications were satisfied. <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.