My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> ® 5.0 GEOSYNTHET►CS CQA <br /> 5.1 General Description of Activities <br /> The geosynthetic components of Stage lA closure consisted of geosynthetics <br /> placed as seep collectors on the side slopes, including 60-mil HDPE <br /> geomembrane, geocomposite, and geotextile. The Vector CQA monitor followed <br /> standards of practice to monitor the installation of the geosynthetic <br /> components of the seep collectors, as conformance testing of the geosynthetics <br /> was not required by the technical specifications. <br /> 5.2 Geomembrane <br /> A 60-mil thick double-sided textured high-density polyethylene (HDPE) <br /> geomembrane manufactured by GSE was used in the seep collectors for the <br /> Stage lA closure. The remaining geomembrane supplied for construction of <br /> the floor of WMU FU-05 was also used for the seep collectors. This <br /> geomembrane was previously approved and satisfied the project specifications <br /> for use in the Stage lA closure. Documentation on the geomembrane is <br /> included in the FU-05 CQA Report. <br /> 5.3 Geotextile <br /> A 12-oz/yd2 geotextile was used as a separation and cushion layer between the <br /> granular drainage material and the geomembrane in the seep collector trenches <br /> to encapsulate the gravel fill and HDPE piping. The remaining geotextile <br /> supplied for construction for the floor of WMU FU-05 was also used for the <br /> seep collectors. This geotextile was previously approved and satisfied the <br /> project specifications for use in the Stage lA closure. Documentation on the <br /> geotextile is included in the FU-05 CQA Report. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.